Skip to the content.

OpenClaw WebOS Improvement Plan — Progress Tracker

Updated: 2026-04-28 Source analysis: docs/SPACE_AGENT_ANALYSIS.md

This plan was refined by Codex against the actual WebOS codebase. Each item has a checkbox for tracking progress. Update the file as work proceeds.


Overall Progress

Phase Items Done Status
P0 — Doc Corrections 5 5/5 ✅ Done
P0 — Quick Wins 7 7/7 ✅ Done
P0 — Hierarchical Docs 1 1/1 ✅ Done
P1 — Features 4 0/4 🔲 Not started
P2 — Features 2 0/2 🔲 Not started
P3 — Deferred 2 ⏸️ On hold

P0: Documentation Corrections

Every feature below depends on accurate references. Fix these first.


P0: Quick Wins

Small changes with outsized impact. Most are one-line fixes.


P0: Hierarchical Documentation Ownership

Every source directory that owns code also owns a documentation contract.


P1: Persistent Agent Memory System

Status: Partially implemented — server and view exist, needs route normalization and new endpoints

Current infrastructure:

Complexity: M Dependencies: DOC corrections, QW-4

P1: Optimistic UI Updates

Status: Partially implemented — offline queue exists for tasks, needs to cover all mutations

Current infrastructure:

Complexity: M Dependencies: DOC corrections, QW-2

P1: Time Travel / History

Status: New — partial audit/history foundation exists

Current infrastructure:

Complexity: L Dependencies: DOC corrections

P1: Local Export/Import Bundle

Status: Partially implemented — settings export/import exists, exportData()/importData() in asana.js unused

Complexity: M Dependencies: Time Travel (for rollback), DOC corrections

P2: Spaces / Workspaces

Status: New — partial layout/filter foundations exist

Complexity: L Dependencies: Memory system (for agent instructions per space)

P2: Dashboard Agent Chat

Status: Partially implemented — session chat exists, needs dashboard context and safe actions

Complexity: L Dependencies: Memory system, SSE enablement

P3: Deferred

These are valid ideas but not priorities right now.

Multi-User Auth (P3)

Desktop App Packaging (P3)


Features Dropped


New Ideas (Not Yet Scheduled)

These were discovered by Codex from the actual codebase. Schedule when capacity allows.


Change Log

Date Change
2026-04-28 Initial plan created by Codex from SPACE_AGENT_ANALYSIS.md + codebase audit
2026-04-28 Converted to progress tracker with checkboxes